Your domain registration is pending. Check back in an hour
Posted on Apr 28, 2021

CH + Architects, Ltd.

Another successful project on the way.
Elgin, IL area

The excavation process started :
setting corner benchmarks.
surveying ground and top levels.
excavation to the approved depth.
dressing the loose soil.
marking up the cut off level.
the construction of dewatering wells and interconnecting trenches.
marking the boundaries of the building.
the construction of protection drains.
Contact Us
Message sent. We'll get back to you soon.